 |
| XYPEX Specialist Projects |
|
Basements and Underground Structures »
KLCC Station - Duta Plaza, Kuala Lumpur, Malaysia
Approx. 40,000 m2 of various reinforced concrete structures were treated
Read more »
Tunnelling »
KCRC East Rail Projects - Hong Kong
XYPEX Admix C-1000NF has been called for in 135,000 cubic metres of concrete
Read more »
Marine »
Chiswick Wharf Ferry Terminal
Xypex Concentrate was applied through all construction joints, as well as in dry pac form in the tie bolt holes.
Read more »
Roofs, Parking and Exposed Decks »
JABIL CIRCUIT: Bayan Lepas, Palau Penang, Malaysia
More than 8600 kilograms of Xypex Admix C 1000-NF were dosed into concrete cast into the ground slabs and reinforced concrete roof decks of this very large "clean room" facility
Read more »
Precast »
Murray Irrigation - Finley NSW
Xypex Concentrate coating was applied to 50 pipes, to seal fine hairline cracks and for concrete protection.
Read more »
Reservoirs »
Outlet Shaft and Access Tunnel, Loombah Resevoir Benalla
The major concern in this 50 year old structure was six construction joints leaking badly.
Read more »
Sports Structures »
Multi-Purpose Stadium, Melbourne Park
440 cubic metres of concrete was supplied by Pioneer and construction was by Thiess Contractors Pty Ltd.
Read more »
Shotcrete »
Trail Of Elephants Melbourne Zoo
In excess of 160m3 of Shotcrete & insitu concrete was dosed with Xypex Admix C-1000NF
Read more »
Swimming and Decorative Pools »
Trail of Elephants Development - Melbourne Zoo, Australia
In excess of 160m3 of Shotcrete & insitu concrete is being dosed with Xypex Admix C-1000NF in the Elephant Pool.
Read more »
Bridge Structures »
Caboolture Northern Bypass Project, Smiths Road and Williams Road Overpasses.
Xypex Concentrate was chosen by the Department of Main Roads because of its ability to bridge and seal cracks.
Read more »
Aquariums »
Melbourne Aquarium
Xypex Concentrate and Xypex Patch n Plug were used to eliminate all leakages.
Read more »
Sewage and Wastewater »
Sewerage Reticulation Plant
Puckapunyal Victoria, Australia - Repair and restoration of this 50 year old plant, located at the Puckapunyal Royal Australian Army Base, was completed using Xypex Patch n Plug and a two coat application of Xypex Concentrate and Modified.
Read more »
Chemical Protection »
Dry Kiln, Holbrook, NSW
The dry kiln operated at 100c and 100% humidity.
Read more »
Hospital and Medical »
University Hospital Kuala Lumpur Trauma Centre
Strategic areas of the Trauma centre have been treated with Xypex systems
Read more »
Food Industry »
Winemaking Complex
Pokolbin Hunter Valley, NSW - To substantially extend the life of the concrete.
Read more »
|